
Reinforced concrete + Steel · Yenikapı, Istanbul
Eurasia Tunnel
- Scope
- Reinforced concrete + Steel
- Location
- Yenikapı, Istanbul
- Period
- 2014–2016
- Duration
- 760 days
About the project
TBM exit structure, U-turn bridge, strut installations and overpass at Yenikapı.
On the Eurasia Tunnel (Avrasya Tüneli) project, we carried out reinforced concrete and steel work at Yenikapı. The work ran from 2014 to 2016, with a duration of 760 days.
Our work falls under four headings: the reinforced concrete for the TBM exit structure, the U-turn bridge, steel strut (bracing) installations and the Yenikapı overpass. You will find site photos of each in separate tabs in the gallery.
From the site
Next projectTersane IstanbulGet a quote for your project
Write to us or call us for a price quote, technical information or any other question you may have.
