Steel · Bodrum, Muğla
Maçakızı Hotel
- Scope
- Steel
- Location
- Bodrum, Muğla
- Period
- 2018–2019
- Duration
- 90 days
About the project
Steel work in Bodrum; 2018–2019, 90 days.
On the Maçakızı Hotel project in Bodrum, we carried out the steel work. The work, carried out in 2018–2019, took 90 days.
In our steel work, we produce the structural elements in our own fabrication workshop and our own crew erects them on site. You will find site photos in the gallery below.