Reinforced concrete · Sarıgazi, Istanbul
Sarıgazi Metro Station
- Scope
- Reinforced concrete
- Location
- Sarıgazi, Istanbul
- Period
- 2022–2023
- Duration
- 300 days
About the project
Reinforced concrete work for a metro station in Sarıgazi; 2022–2023, 300 days.
At Sarıgazi metro station, we carried out reinforced concrete work. The work, carried out in 2022–2023, took 300 days.
Together with Sancaktepe metro station, it is one of our projects in metro construction. You will find site photos in the gallery below.